1. Description:
2. Inspection
In order to ensure the quality of the orders,our independent QC members to carry out strict inspection at each stage:
(1)Incoming material inspection
(2)Inspection of work-in-progress
(3)Finished product inspection
(4)Random warehouse inspections
All of our operations are strictly compliant with ISO 9001: 2008 guidelines, we own automated casting lines, CNC machining, CMM inspection, spectrometers and MT testing equipment, X-ray.
3. Our customer
4. Package and Shipping
5.Certificate
6. FAQ
1.How can I get the quotation?
Please give us your drawing,quantity,weight and material of the product.
2.If you don't have the drawing,can you make drawing for me?
Yes,we are able to make the drawing of your sample duplicate the sample.
3.When can I get the sample and your main order time?
Sample time: 35-40 days after start to make mold.
Order time: 35-40 days, the accurate time depends on product.
4.What is your payment method?
Tooling:100% T/T advanced
Order time:50% deposit,50%to be paid before shipment.
5.Which kind of file format you can read?
PDF, IGS, DWG, STEP, MAX
6.What is your surface treatment?
Including: powder coating, sand blasting, painting, polishing, acid pickling, anodizing, enamel, zinc plating, hot-dip galvanizing, electrophoresis, chrome plating.
7.What is your way of packing?
Normally we pack goods according to customers' requirements.
Material for sand casting | A356.0/ZL101,GAlSi7Mg (3.2371.61)/AlSi7Mg/, A-S7G, Al Si Alloy, Al Cu Alloy ZL201 Al Mg Alloy ZL301,ZL302, Al Zn Alloy ZL401Zn Alloy Zamak 3, Zamak 5, Zamak 7, Zamak 2, Or according to customer requirements |
Surface Treatment | Shotnd blast, polishing, Primer Painting , Powder coating, ED- Coating, Finish Painting, Anodize (White or Black Color), as customers request. |
Tolerance | ISO2768-m, CT 5,6,7,13 |
Heat Treatment | T5~T6, as customers request |
Packaging | Carton Box/Wooden Box/Steel Pallet or as customer requirements |
Certificates | ISO9001:2008 |
Application | Automotive parts, railroad parts, marine parts, valve parts, architectural parts |
In order to ensure the quality of the orders,our independent QC members to carry out strict inspection at each stage:
(1)Incoming material inspection
(2)Inspection of work-in-progress
(3)Finished product inspection
(4)Random warehouse inspections
All of our operations are strictly compliant with ISO 9001: 2008 guidelines, we own automated casting lines, CNC machining, CMM inspection, spectrometers and MT testing equipment, X-ray.
3. Our customer
4. Package and Shipping
5.Certificate
6. FAQ
1.How can I get the quotation?
Please give us your drawing,quantity,weight and material of the product.
2.If you don't have the drawing,can you make drawing for me?
Yes,we are able to make the drawing of your sample duplicate the sample.
3.When can I get the sample and your main order time?
Sample time: 35-40 days after start to make mold.
Order time: 35-40 days, the accurate time depends on product.
4.What is your payment method?
Tooling:100% T/T advanced
Order time:50% deposit,50%to be paid before shipment.
5.Which kind of file format you can read?
PDF, IGS, DWG, STEP, MAX
6.What is your surface treatment?
Including: powder coating, sand blasting, painting, polishing, acid pickling, anodizing, enamel, zinc plating, hot-dip galvanizing, electrophoresis, chrome plating.
7.What is your way of packing?
Normally we pack goods according to customers' requirements.